A simple clock icon with a gold-brown circular background. The hour hand points to 9 and the minute hand points to 5, indicating the time is approximately 9:25. The clock hands and markings are dark green.

Open

Monday to Friday, 8AM to 5PM

Labor vs Materials: Where Your Remodel Budget Really Goes

A person with short dark hair and a dark shirt stands beside a large beaker filled with dark liquid topped by a brown layer. The beaker sits on a wooden base and has a sticker labeled "STEWART INC." The background is a plain, light beige color.

When you get a remodel estimate, most of the number is not the tile, the cabinets, or the paint. It is the labor.

On a typical room remodel, labor usually runs more than half of the total, often 60 to 70 percent, with materials making up the other 30 to 40 percent. That split shifts with the project and the finishes you choose, which is why understanding the labor vs materials cost of a remodel tells you where you can trim the budget safely and where trimming only buys you trouble.

That one ratio explains why two homeowners can spend wildly different amounts on the same size kitchen, and why the cheapest bid is often the one that hurts the most later.


The typical labor vs materials split in a remodel

The old contractor rule of thumb is that labor is about two thirds of a job and materials are about one third. It holds up well in the real world. National figures put labor somewhere between 40 and 60 percent of a project, and remodelers who have tracked hundreds of their own jobs land right in that band, often around 65 percent labor and 35 percent materials.

So on a $40,000 remodel, you are usually looking at roughly $26,000 in labor and $14,000 in materials, give or take. That surprises a lot of homeowners, who assume the shiny stuff they picked out is where the money went.

It is not a fixed law, though. The split moves with the type of work, how much of it is hidden inside walls, and how expensive the finishes are. Here is how that plays out.


How the split changes by project type

Some projects are labor heavy because they involve a lot of skilled hands and not many premium products. Others tilt toward materials because the finishes carry the cost. This is a rough map, not a promise, since every home is different.

ProjectTypical labor shareTypical materials share
Kitchen remodel60 to 67 percent33 to 40 percent
Bathroom remodel55 to 69 percent31 to 45 percent
Basement finish70 to 74 percent26 to 30 percent
Home addition65 to 71 percent29 to 35 percent
Flooring replacement35 to 45 percent55 to 65 percent

Notice the pattern. The more skilled trade work a project needs, the higher the labor share. A basement or an addition is mostly building something from rough space, so labor dominates. Flooring flips the other way, because the material is the main event and the install is quick by comparison.

Size matters too. A bigger footprint means more hours, so labor climbs with square footage even when the design stays simple. If you want to see how scope and size drive the number, our breakdown of home remodel cost per square foot walks through it.


Why labor is usually the bigger number

Labor costs more because you are not paying for time, you are paying for skill. A remodel touches framing, plumbing, electrical, tile, drywall, and finish carpentry, and each of those is a trade that took years to learn and has to meet code.

Some trades are almost pure labor. Running a new electrical circuit or setting a tile shower can cost several times more in labor than the parts themselves, because the wire and the tile are cheap and the expertise to install them safely is not. A single skilled hour also carries training, licensing, insurance, tools, and the rest of the crew standing on your job.

This is also why labor is the part of a bid you cannot really shop away. Plenty of other things move the total, and we cover them in what actually drives the cost of a home remodel, but skilled labor is the floor under the whole project.


When materials flip the ratio

Materials take over the budget when you reach for premium finishes. Custom cabinets, natural stone, imported tile, and professional grade appliances can push the materials share well past its usual third.

In a kitchen, cabinets alone often eat 30 to 40 percent of the entire materials budget, with countertops and appliances taking big bites after that. Swap stock cabinets for custom and you can move thousands into the materials column without changing a single hour of labor.

That is the useful part. The finish level you choose is the biggest lever you control. The labor to hang a cabinet is roughly the same whether the box cost $200 or $2,000, so your material choices, not the crew, are usually what separates a mid range budget from a luxury one.


The allowance gap that quietly blows up material budgets

Here is where material budgets go sideways. Many estimates include an allowance, a placeholder dollar amount for things you have not picked yet, like tile, fixtures, or appliances. The trap is that a low allowance makes the bottom line look great until you go shopping.

A bid might carry a $2,500 appliance allowance that covers builder grade basics and nothing more. If you actually want a counter depth refrigerator and a real range, that allowance covers maybe half of what you will spend, and the difference lands on you as an overage.

Always ask what each allowance assumes and whether it matches the level of finish you have in mind. Allowances set too low are one of the most common reasons a project drifts over budget, which we get into further in the hidden costs of remodeling nobody warns you about.


What the labor and materials split leaves out

The two column split does not capture everything. A real project also carries soft costs: permits, design fees, engineering when a wall moves, and inspections. These often run 5 to 20 percent of the total and show up in neither the labor nor the materials line.

Homeowners underestimate these constantly, because they see a contractor number and assume it is all in. A clear, itemized estimate should spell out where these sit so nothing hides. In older homes especially, permits and inspections are not optional paperwork, they are what keeps the work safe and the resale clean.


What a suspiciously low labor number really means

Since labor is the biggest and least flexible part of a remodel, a bid with a strangely low labor figure should make you cautious, not excited. Cheap labor usually means one of three things: the contractor underpriced the job to win it and will chase change orders later, they are subcontracting the trades without much oversight, or they plan to use unlicensed and uninsured workers.

That last one is the real danger. Unlicensed labor can leave you with work that fails inspection, voids warranties, or leaves you liable if someone gets hurt on your property. A fair labor number is not the enemy. It is a sign that qualified, insured people are doing the work.

This is exactly why 570 Remodeling is licensed and fully insured and puts a fixed, transparent price and a clear scope of work in front of you before anything starts. The labor line should be something you understand, not a mystery.


Where you can actually cut, and where you should not

Once you see the split, smart budgeting gets simple. You have three levers, and they are not equal.

  • Finishes: your biggest safe lever. Choosing mid range materials over luxury ones can move a budget more than anything else, with no effect on how well the work is done.
  • Scope: the next lever. Doing three rooms instead of five, or leaving the layout where it is instead of moving plumbing, cuts labor hours directly. Keeping walls and pipes in place is one of the biggest savings available.
  • Sweat equity: a small lever, use it carefully. Handling your own demolition, cleanup, or painting can shave some labor. Buying your own materials can dodge the usual 10 to 20 percent contractor markup, but you take on the coordination and the warranty risk if something is wrong.

What you should not cut is the skilled, licensed labor that holds the whole project up. That is the part that keeps the work safe, up to code, and standing years from now. If you want a clean way to plan all of this, our guide to budgeting for a remodel line by line turns the split into an actual working budget.


How the split tends to look in northeastern Pennsylvania

National labor to materials ratios are often quoted from expensive coastal markets, where skilled labor runs far above the national average. In Luzerne County, labor rates sit closer to that national average, which means materials tend to make up a slightly bigger share of a local budget than a California cost guide would suggest.

Two local realities push the other way, though. Many Wilkes-Barre area homes are older, and once a wall opens you can find knob and tube wiring, old galvanized pipe, or plaster that adds real labor nobody could see from the estimate.

Our freeze and thaw winters also punish exterior work, so siding, roofing, and foundation repairs can carry more labor than the same job in a mild climate. A local crew that has seen these homes prices for them instead of getting surprised by them.


Frequently Asked Questions

What percentage of a remodel is labor vs materials?

On most home remodels, labor is roughly 60 to 70 percent of the total and materials are the other 30 to 40 percent. The split changes by project, with basements and additions leaning more toward labor and flooring jobs leaning toward materials.

Is labor really more expensive than materials?

Usually, yes. Across most remodel types labor is the larger share, often around two thirds of the cost. It only flips when a project uses very high end finishes or is material heavy and quick to install, like replacing flooring.

Why is remodeling labor so expensive?

You are paying for skilled trades, not just time. Framing, plumbing, electrical, and tile all require training, licensing, and insurance, and the work has to meet code. For some trades, like electrical and tile, the labor can cost several times more than the materials being installed.

Can I buy my own materials to save money?

Sometimes. Contractors typically mark materials up 10 to 20 percent, so supplying your own can trim that. The tradeoff is that you take on ordering, delivery timing, and the warranty headache if something arrives wrong or damaged. Ask your contractor before you buy, since a wrong material can stall the whole crew.

Does a high labor cost mean I am being overcharged?

Not by itself. A fair labor number reflects skilled, insured people doing the work. A suspiciously low labor number is the bigger warning sign, because it often points to underpricing, weak oversight, or unlicensed workers. Compare bids on scope and what is included, not on the labor line alone.

What is a materials allowance in an estimate?

An allowance is a placeholder amount for items you have not chosen yet, such as tile, fixtures, or appliances. If the allowance is set low, the estimate looks cheaper than your project will actually cost once you pick what you want. Always confirm what each allowance assumes.

Where can I actually cut costs without hurting the result?

Your finishes and your scope. Choosing mid range materials and keeping the existing layout are the two safest ways to lower a budget. Cutting the licensed labor that does the skilled work is where savings turn into problems.


Planning a remodel in Luzerne County?

Once you understand the labor and materials split, the next step is seeing the real numbers for your home. At 570 Remodeling, we visit your property, look at the actual scope, and put together a fixed, transparent estimate with a clear breakdown, so you know exactly where your budget is going before any work begins. If you are weighing your options, reach out for a free quote and we will walk you through it as neighbors, not strangers.

Get Your Free Quote

Tell us about your project and we will get back to you with a real number for your space. No pressure, no obligation.

Free Quote (Footer)

Ready to Transform Your Home?

Our Wilkes-Barre team is ready to bring your vision to life. Get a free, no-obligation estimate today.

Written by the 570 Remodeling Team

570 Remodeling is Wilkes-Barre’s trusted local remodeling contractor, serving Luzerne County homeowners with bathroom, kitchen, basement, deck, siding, and roofing projects since day one. Every article is written from real field experience, not guesswork.

You Might Also Like

Ready to Start Your Remodel?

Wilkes-Barre’s local remodeling contractor, honest estimates, no pressure, real craftsmanship. Call us today or request your free quote online.