Open
Monday to Friday, 8AM to 5PM
At 570 Remodeling, we help you turn the most underused space in your home into one of the most valuable.
Basements in Forty Fort’s older residential homes are often unfinished, damp, or finished patchwork-style decades ago in ways that didn’t hold up. Before anything else gets built, we assess what’s down there and address it correctly.

From full basement finishing to targeted moisture remediation in Forty Fort homes, we handle every phase of the project. Here’s what we offer:
Every Forty Fort basement is different — ceiling height, column placement, stair location, and the homeowner’s goals all factor in. We design the layout before framing starts so the finished space actually works, whether it’s a family room, home office, or in-law suite.
NEPA basements move water — especially in older Forty Fort homes built before modern drainage standards. We address moisture first: foundation crack sealing, interior drainage channels, sump system installation or upgrade, and vapor barriers behind the framing. A dry basement is a prerequisite, not an optional upgrade.
Code-compliant egress windows that convert basement bedroom space from a legal gray area into a proper room. We cut the opening, install the well, and frame properly so the window looks like it belongs — not like an afterthought.
Engineered hardwood, luxury vinyl plank, and tile installed over properly prepared subfloor. Recessed lighting planned with the layout — not after framing is done. In Forty Fort basements with lower ceiling heights, we route lighting carefully to maintain clearance.
Framing held off the foundation wall — not sitting against it where moisture migrates. Closed-cell spray foam or rigid foam insulation in Luzerne County basements handles the thermal mass of a below-grade wall better than fiberglass batts against concrete.
Acoustic insulation between floor joists, resilient channel on ceiling drywall, and solid-core doors for basement spaces that need it — home theaters, music rooms, offices with video calls. We build the soundproofing into the construction, not as a retrofit.
Forty Fort homeowners trust us with basement projects for a few specific reasons:
We pull permits through Luzerne County and work with Forty Fort’s local building requirements. Egress windows, electrical, and structural changes all go through the right channels — so the finished basement is legal and insurable.
NEPA’s wet springs and heavy winter moisture make basement waterproofing non-optional. We’ve seen what happens when it’s skipped or done cheaply in Forty Fort homes — and we build to prevent it from the start.
Finishing a basement is one of the highest-return projects in an older Forty Fort home. We build it to a standard that adds real square footage value — not just a room that looks fine until the first wet spring.
A properly finished, waterproofed, and permitted Forty Fort basement adds usable square footage that shows up in the appraisal. We build basements that pass inspection and hold their value.

We apply the same transparent, straightforward process to every Forty Fort basement — from a moisture assessment to a full finishing project:
Give us a call or fill out the form to schedule your free in-home consultation. We’ll come take a look at your Forty Fort basement and tell you what it needs — we’ll be in touch to confirm a time.
We limit how many basement finishing projects we take on at once — it’s the only way to keep the work at the level we hold ourselves to. If you’re planning a Forty Fort basement project, earlier is better for scheduling.